当前位置:首页-新闻中心新闻中心

通风管道设备安装工程量怎么计算

发布人:http://www.sftfgd.com   发布时间:2022-08-10 18:00:10

通风管道设备安装工程量怎么计算:

How to calculate the installation quantities of ventilation duct equipment:

1、金属空调器壳体、滤水器、溢水盘 按施工图要求,查标准图或《通风空调工程》定额附录一计算质量,非标准部件按成品质量计算。

1. The metal air conditioner shell, water filter and overflow tray shall be calculated according to the requirements of the construction drawing, and the quality shall be calculated according to the standard drawing or the quota Appendix I of ventilation and air conditioning engineering. The non-standard parts shall be calculated according to the quality of finished products.

2、钢挡水板按空调器端面面积计算工程量 以“”计量,计算式如下: 挡水板面积=空调器断面积×挡水板张数或挡水板面积=A× B×张数,钢挡水板制作安装以曲折数(3折\6折)和板距分档次,套用相应子目。玻璃挡板,使用钢板挡水板相应子目,其材料、机械均乘以系数0.45,人工不变。

2. The steel water baffle is calculated according to the end surface area of the air conditioner. The quantities are measured in square meters. The calculation formula is as follows: water baffle area = sectional area of the air conditioner × Number of baffle plates or area of baffle plate = a ×  B × The number of sheets, the fabrication and installation of steel water retaining plate shall be graded according to the number of twists (3-fold \ 6-fold) and the plate distance, and the corresponding sub items shall be applied. For the glass baffle, the corresponding sub items of steel plate water baffle are used. The material and machinery are multiplied by the coefficient of 0.45, and the labor is unchanged.

QQ截图20170428145354.png

3、钢密闭门以带视孔和不带视孔分档 分别以个计量,套用相应子目。

3. The steel closed door shall be measured in pieces with and without sight holes, and the corresponding sub items shall be applied.

4、设备支架 按施工图要求以质量计算。

4. The equipment support shall be calculated by mass according to the requirements of the construction drawing.

5、清洗槽、浸油槽、晾干架、LWP滤尘器支架的制作安装 按质量计算工程量,用设备支架子目。

5. The fabrication and installation of cleaning tank, oil soaking tank, drying rack and LWP dust filter support shall be calculated according to the quality, and the equipment support sub items shall be used.

关于通风管道是什么呢,以及通风管道设备安装工程量怎么计算的相关内容,这里就为大家分享这么多了。相信通过之前的讲解之后,大家对于通风管道的概念以及通风管道设备安装工程量计算,都已经比较熟悉和了解了,所以今天就不再重复说明了。不过,如果大家对通风管道的知识,还有什么疑问的话,欢迎大家前来重庆科新通风咨询关于通风管道的问题。

What is the ventilation duct and how to calculate the installation quantities of the ventilation duct equipment, so much is shared here. I believe that after the previous explanation, we have been familiar with the concept of ventilation duct and the calculation of the quantities of ventilation duct equipment installation, so we will not repeat the explanation today. However, if you have any questions about the knowledge of ventilation ducts, you are welcome to come to Chongqing Kexin ventilation Co., Ltd. to consult about the ventilation ducts.

以上就是为大家介绍的有关济南通风管道的详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务http://www.sftfgd.com

The above is the detailed introduction of Jinan ventilation duct. I hope it will help you. If you have any questions, please contact us. We will provide you with services with a professional attitude http://www.sftfgd.com


上一篇:镀锌铁皮风管有什么特点
下一篇:玻璃钢通风管道的特点有哪些?

网站首页 关于我们 产品展示 新闻中心 工程案例 在线留言 联系我们